Sunday, September 29, 2019

Plaster completed

Things are speeding along.

During design phase, I was a bit concerned about the lack of window over the stairs for natural light.
Not too bad - although, there is still light coming from the master bedroom. Will know exactly once the doors are in.

Bulkhead over kitchen
Manhole in master ensuite, not in the right place, was meant to be in the retreat.

Master WIR has been extended to 600mm depth.  It looks smaller now that the plaster has gone in.  Okay still pretty big :D

Powder room sink bulkhead is a bit low.

Garage floor has been prepared.


No comments:

Post a Comment