Friday, March 9, 2012

Fixing stage completed!

Received invoice 7/3/11

Dw1 looking from lounge into dining area, hallway to front door and retreat on rightDw1 looking from hallway into open plan kitchen, lounge and stairs leading to garageDw1 masterbedroom with bulkheadDw 2 open plan kitchen/dining area
Fixing stage complete! 25%

Also other things that had been done:

Powerpoint/switchplates/lights cut out.Not happy with the position of DW1 lounge and dining downlights. The 2 sets of 4 are too far apart which means there's less light in between the 2 sets. Also not happy about Dw2 appliance powerpoint in pantry as it's to the left. Prefer it in the middle.

Fusebox
Cut out of basins - Dw1 main bathroom - Avon 500 basin
Shelves for linen and coat cupboards. Dw2 linen/coat cupboard

No comments:

Post a Comment